
FAMAR – Design and build 2 stability rooms
Pharma Industry Avlonas 2026 Two stability rooms were designed and built at the FAMAR factory in Avlona. Two HVAC and CHILLER systems were installed to maintain constant

Pharma Industry Avlonas 2026 Two stability rooms were designed and built at the FAMAR factory in Avlona. Two HVAC and CHILLER systems were installed to maintain constant

Food & Beverage Schimatari 2025 HVAC & Process Cooling of the new COCA COLA PET lineDew point adjustment of the space for proper product packaging processing. It

Food Industry Elassona 2025 Upgrading of the HVAC unit for special cheese ripening/drying conditions. Controlling and maintaining temperature and humidity to remove moisture from the

Food Industry Neochorouda Thessaloniki 2025 HVAC upgrade in the cheese ripening room. Temperature and humidity control through ventilation to achieve proper cheese hardening. A Packaged Central HVAC Unit was installed

Βιομηχανία Σωλήνων Βοιωτία 2025 Replacement of three gas boilers with one (1) Central HVAC Unit with an air supply of 30,000 m³/h, in the Curing room. The CCU brings

The purpose of the project was to upgrade the cooling system of the factory in order to better supply the machinery of the company’s factory. Chemical Industry Madaro, Oinofyta, Greece

Fruits & Vegetables Isthmia, Greece 2016 SOYA MILLS SA is a company with continuous growth that operates both in Greek territory and the Eastern Mediterranean. Its main products are proteins

Beverages Industry Lamia, Greece 2008 Fresh juices production plant in Lamia Greece. “Life” band juices.Project overview: Chilled glycol system -6oC for juices cooling during process, 800kW installed cooling capacity Production