PA270160

FENIX Hotel – Commercial HVAC

PA270160

FENIX Hotel – Commercial HVAC

Assembly Buildings

Glyfada, Greece

2017

Our company has provided the central cooling and heating systems for FENIX Hotel, Glyfada Greece.

The HVAC systems incorporated a special application which led to significant energy conservation in heating due to the fact room setting temperature and supplied hot water temperature is determined by ambient temperature by a special algorithm. That means that in semi-weather when ambient temperature is moderate automatically the produced heating is lower compared to a cold day before this is clearly observed by the rooms thermostats and afterwards instruct the heating system to cut-off. With this method we avoided to heat the building structure more than what is needed leading to significant energy conservation.

We also designed and materialized the HVAC systems for the two conference halls of the hotel.

Latest Hightlights
Subscribe to our Newsletter

Relevant Projects

Serum IVF – Laboratories

Life Science Lykovrysi, Greece 2019 Design & Construction of the HVAC system of the new Laboratory spaces and operating rooms of Serum IVF Clinic, in Lykovrysi, Athens. Grade D purity

Read More »

Pleioflow – Cleanroom

Project Description  Construction of Cleanroom with purity class ISO 7 (at operation) according to ISO 14644 for the company Pleioflow, in which medical devices will be produced and assembled. Construction

Read More »

Pharmathen Sapes – Cleanroom

Life Science Sapes, Greece 2013 Pharmathen, cleanrooms HVAC reconstruction, Sapes Greece Project Description: The project was to remake all the HVAC systems for first production plant of Pharmathen Pharmaceuticals factory

Read More »