CPW (Corinth Pipe Works) factory of the Stassinopoulos Group once again entrusted the expertise of the BCT Group and Automation & Power. The collaboration of all involved parties yielded excellent results, successfully completing the pipe cooling system at their intermediate welding stages.
BCT-Group was responsible for the study, design and installation.
The project included the installation of the following equipment:
- Two Central Air Conditioning Units (CACUs)
- An air-cooled glycol solution cooling system
- Adjustable height fabric ductwork within the room
- Ductwork networks outside the building
- Piping networks inside and outside the production room
- Electrical power and automation panels
- Electrical power and automation wiring
![](https://www.bct-group.gr/wp-content/uploads/2024/04/Solinourgeia-05516_resize-1024x683.jpg)
![](https://www.bct-group.gr/wp-content/uploads/2024/04/Solinourgeia-05556-2-topaz-denoise_resize-1024x683.jpg)
![](https://www.bct-group.gr/wp-content/uploads/2024/04/Solinourgeia-05564_resize-1024x683.jpg)