CPW – Energy Upgrade with heat pumps and back up electric boiler
Βιομηχανία Σωλήνων Βοιωτία 2025 Replacement of three gas boilers with one (1) Central HVAC Unit with an air supply of 30,000 m³/h, in the Curing room. The CCU brings
Process cooling aims in providing cooling to products during the production process.

Βιομηχανία Σωλήνων Βοιωτία 2025 Replacement of three gas boilers with one (1) Central HVAC Unit with an air supply of 30,000 m³/h, in the Curing room. The CCU brings

Food Industry Neochorouda Thessaloniki 2025 HVAC upgrade in the cheese ripening room. Temperature and humidity control through ventilation to achieve proper cheese hardening. A Packaged Central HVAC Unit was installed

Food & Beverage Schimatari 2025 HVAC & Process Cooling of the new COCA COLA PET lineDew point adjustment of the space for proper product packaging processing. It