EODY – 1 Biosafety Laboratory with 2 sublabs
GMP Labs Attica 2026 This was a turnkey project. From conceptual design to commissioning and validation. BCT completed 1 biosafety laboratory BSL-3 with 2 sublabs. the project included the design

GMP Labs Attica 2026 This was a turnkey project. From conceptual design to commissioning and validation. BCT completed 1 biosafety laboratory BSL-3 with 2 sublabs. the project included the design

GMP Καθαροί Χώροι Αττική 2026 This is a turnkey project. It covers everything from initial design to commissioning and validation. BCT completed the construction of three cleanrooms for solid and

BCT has successfully delivered the first HAIT Facility for satellites at the Hellenic Aerospace Industry establishment. It is an ISO 8 cleanroom suite coprised of 1 main facility that will

BCT successfully delivered a 2-floor AIT facility for ICEYE. Basement: Created two new ISO9 working labs Installed the HVAC equipment Constructed the electrical facility Ground Floor: Designed & constructed an

BCT delivered an ISO 7 modular cleanroom with an ISO 7 airlock. The cleanroom features: Modular walls double layer 4mm thickness Airlock Antistatic floor Air Handling Unit 4000 m3/h with

GMP Labs Schimatari 2025 The ACCORD project included the design, construction and inspection of specialized GMP areas with a total area of 700m². In the basement, changing rooms and drug

BCT Group undertook the design, construction and validation of a 15 m² modular ISO 7 cleanroom with an ESD-protected environment for the Cyprus Space Research & Innovation Center. The cleanroom

100% Fresh Air Conditioning Unit for 3 cleanrooms for oil & petrochrmicals inspections. Supply and installation of a new 100% fresh Central Air Conditioning Unit, to compensate for the deficit

Pharma Industry Moschato 2025 Upgrading of storage space with a new air conditioning unit for maintaining temperature and humidity. The project included: Structural configuration of the existing storage

Pharma Industry Paiania 2025 BCT undertook the design and complete renovation – reconstruction of the laboratories and the GMP microbiology laboratory of Rafarm on