BCT has successfully delivered the first HAIT Facility for satellites at the Hellenic Aerospace Industry establishment.
It is an ISO 8 cleanroom suite coprised of 1 main facility that will facilitate the assemblying and testing of micro and nano satellites and 3 peripheral rooms.
BCT undertook the designing of the cleanrooom suite, the dismantling of the old facility, the construction of the entire new facility and the creation of necessary infrastructures to suppport all the AIT systems such Anti-seismic material installation for vibration isolation and support of the SHAKER and a load-bearing structure, handling system, water inlet/outlet connections for the TVAC.
A Controlled Environment Designed for Satellite Workflow
- Loading Bay and Controlled Unloading System
- Airlocks: Personnel and Material flow
- High-bay ISO Class 8 cleanroom with crane lifting for component flow
- ESD Workbenches for subsystem handling
- Anti-seismic material installation for vibration isolation and support of the SHAKER
- Load-bearing structure, handling system, water inlet/outlet connections for the TVAC














