
Accord – GMP Labs
GMP Labs Schimatari 2025 The ACCORD project included the design, construction and inspection of specialized GMP areas with a total area of 700m². In the basement, changing rooms and drug

GMP Labs Schimatari 2025 The ACCORD project included the design, construction and inspection of specialized GMP areas with a total area of 700m². In the basement, changing rooms and drug

100% Fresh Air Conditioning Unit for 3 cleanrooms for oil & petrochrmicals inspections. Supply and installation of a new 100% fresh Central Air Conditioning Unit, to compensate for the deficit

Pharma Industry Paiania 2025 BCT undertook the design and complete renovation – reconstruction of the laboratories and the GMP microbiology laboratory of Rafarm on

Laboratories Athens 2022 Design & Construction of 100 sq.m high risk Biosafety Laboratories BSL 3, for the Microbiology Department of Pasteur Institute in Athens, Greece. The design is in accordance

Laboratory Patra, Greece 2021 Design, Construction & Validation of a complex of Cleanrooms which are used as Laboratories to research innovative therapies for hematological cancer in the Medical School of

Cleanroom GMP Class A/B Re-Design & Construction for the Quality Control Department of the Hellenic Pasteur Institute. It is used as a laboratory for the quality control of injectables. Laboratories

Laboratory Thrakomakedones, Greece 2020 This project concerned the reconstruction of facilities in the National Hematology Center, to form a suite of 4 Biosafety Laboratories in which hematological analysis are performed

Life Science Lykovrysi, Greece 2019 Design & Construction of the HVAC system of the new Laboratory spaces and operating rooms of Serum IVF Clinic, in Lykovrysi, Athens. Grade D purity