EODY – 1 Biosafety Laboratory with 2 sublabs
GMP Labs Attica 2026 This

GMP Καθαροί Χώροι

Αττική

2026
This is a turnkey project.
It covers everything from initial design to commissioning and validation.
BCT completed the construction of three cleanrooms for solid and liquid processing operations.
Two HVAC units and two VRV-HEPA heat pump systems were installed.
A complete electrical installation was also carried out.



GMP Labs Attica 2026 This

GMP Καθαροί Χώροι Αττική 2026

BCT has successfully delivered the

Βιομηχανία Τροφίμων Οινόφυτα 2026


BCT successfully delivered a 2-floor

Pharma Industry Avlonas

BCT delivered an ISO 7

Food & Beverage Schimatari

GMP Labs Schimatari 2025 The

Military & Security Applications Koropi 2023 BCT-Group designed and constructed a cleanroom of 180 square meters for THEON INTERNATIONAL, with cleanliness class ISO 8 (during operation), to be used as

HVAC and CLEANROOM GRADE D design and construction for the production area of blistering foils of Symetal’s SA factory in Mandra, Attica. The cleanroom formed to produce foils that are

Life Science Athens, Greece 2021 Design and Construction of a Cleanroom class ISO 7 (at operation) and a vestibule according to GMP Class C The cleanroom will be used for