
GMP Labs

Attica

2026
This was a turnkey project.
From conceptual design to commissioning and validation.
BCT completed 1 biosafety laboratory BSL-3 with 2 sublabs. the project included the design and coinstruction of the cleanrooms including lab furniture, the HVAC and Heat pump installations, waste management system for all liquids, emergency shhowers and eye washers, digital access system, electrical installations (UPS, provider and Genertor) and fire detectors.
Both labs work under continuous hyperpressure for maximum safety.















