DJI_0033_main

Greek Family Farm – Industrial HVAC & Refrigeration

DJI_0033_main

Greek Family Farm – Industrial HVAC & Refrigeration

Project overview
Feta Cheese Production Plant
Feta Production Room:
  • Ventilation, vapor discharge in environment
  • Air conditioning at  + 27 ° C
  • Heating to + 16 °C at start of cheese making

Dairy

Almiros, Magnesia Greece

2020 – 2021

Feta Drainage Room:
  • Air conditioning / Heating for temperature maintenance 18oC
  • Controlled relative humidity 80% 
  • Air purity: at least ISO 8 (at rest)
  • Positive air pressure, overpressure: 5-8 Pa
  • Free air-cooling environment
Feta cheese ripening rooms:
  •  Air conditioning at + 18 ° C
Pasteurization Room:
  • Air conditioning at + 25 °C
Boxing hall:
  • Air conditioning at + 17 ° C
Molds Washing Machine Room:
  • Ventilation, vapor discharge in environment
Feta Packaging Room
Opening feta cheese containers, cutting feta cheese & primary packaging:
  • Air conditioning at + 17 ° C
  • Dehumidification to achieve relative humidity <70%
  • Air purity: at least ISO 8 at “at rest”
  • Positive air pressure, overpressure: 5-8 Pa
  • Free cooling
Paper Packaging Room:
  • Air conditioning at + 17 ° C with existing equipment
Cold Room:
  • Refrigeration at 2oC
  • Cold Room Anteroom refrigeration at 8oC
  • Supply and Installation of Refrigeration Equipment
  • Automations
Cold Room for Final Products
Cold Room:
  • Refrigeration at 2oC
  • Supply and Installation of Refrigeration Equipment
  • Automations

Latest Hightlights
Subscribe to our Newsletter

Relevant Projects

Epirus SA – Cleanroom

Project Objective:  Upgrading the air conditioning of a cheese factory in Elassona, Thessaly. Dairy Elassona, Greece 2019 Production rooms that upgraded: Pasteurization Engine Room Basque

Read More »