


Pharma Industry Moschato 2025
Upgrading of storage space with a new air conditioning unit for maintaining temperature and humidity.
The project included:
- Structural configuration of the existing storage space with a frame and ceiling made of polyurethane panels
- Construction of a cold room using polyurethane panels
- New epoxy self-leveling floor
- Supply and installation of the necessary air conditioning equipment for the storage space and cooling for the cold room, according to the project specifications.
- Dismantling works and completely new electrical installation as well as relocation of the fire detection system











