
ES Systems – Cleanroom
Cleanroom class ISO 7 Design & Construction for ES Systems company in Koropi, Attica.It will be used as a laboratory for assembly of electronic circuits for micro-sensors.In addition, a vestibule

Cleanroom class ISO 7 Design & Construction for ES Systems company in Koropi, Attica.It will be used as a laboratory for assembly of electronic circuits for micro-sensors.In addition, a vestibule

Life Science Athens 2019-2021 Reconstruction of Production Areas, Packaging Suite and Warehouses of Adelco SA Total reconstruction completed in three phases in excessively short time during August vacation. Each suite

Project Objective: Upgrading the air conditioning of a cheese factory in Elassona, Thessaly. Dairy Elassona, Greece 2019 Production rooms that upgraded: Pasteurization Engine Room Basque Production Basque Maturation Brining VAT

Beverages – Brewery Patras, Greece 2019 Air conditioning with fresh air – Beer bag packing room Achieving cleanroom conditions with temperature control in the beer bag packing area for the

HVAC and CLEANROOM GRADE D design and construction for the production area of blistering foils of Symetal’s SA factory in Mandra, Attica. The cleanroom formed to produce foils that are

Life science Kryoneri, Attica 2017 Design, supply, installation, and commissioning of HVAC equipment that serve a dry powder filler Cleanroom GRADE A / B class, according to EU GMP for

Dairy Domokos, Greece 2017 Project Objective: Achieving ISO 8 clean space conditions with temperature and humidity control in two “Katiki” rooms at the factory in Domokos. These conditions were achieved

Cables Industry Korinthos, Greece 2015 BCT Group has undertaken the design and the construction of a cleanroom for ultra-high voltage cable manufacturing, (over 120 kV), at Fulgor SA factory in

Life Science Aspropyrgos, Attica 2015 Construction and HVAC system of a Cleanroom in the Pharmathen’s SA warehouse in Aspropyrgos, Attica which is used as a sampling area. Cleanroom HVAC System

Life Science Sapes, Greece 2013 Pharmathen, cleanrooms HVAC reconstruction, Sapes Greece Project Description: The project was to remake all the HVAC systems for first production plant of Pharmathen Pharmaceuticals factory