![](https://www.bct-group.gr/wp-content/uploads/2022/01/factory_blog.png)
Life Science
![](https://www.bct-group.gr/wp-content/uploads/2022/01/location_blog.png)
Lavrio, Attica
![](https://www.bct-group.gr/wp-content/uploads/2022/01/calendar_blog.png)
2020
Construction of Cleanroom ~ 18 sqm of purity class ISO 7 (at operation) which serves as a cell culture laboratory at the Lavrio Technology Park. The project also includes the construction of an ISO 8 lobby in which the laboratory staff prepares and will serves as an auxiliary space.
Turn-key project conducted by BCT specialists:
- Configuration of laboratory spaces
- Design & implementation of HVAC system
- Cleanroom Validation. Commissioning, measurements & certifications of cleanroom according to ISO 14644 & EU GMP.