EODY – 1 Biosafety Laboratory with 2 sublabs
GMP Labs Attica 2026 This
BCT Group completed the design and construction of ISO 6 and ISO 8 cleanrooms for two new high-voltage cable insulation lines (CCV lines) at the CABLEL factory in Thebes.
The HVAC system comprises three (3) new cleanroom-grade air handling units (AHUs), an air-cooled chiller, piping, and air ducts.
The design achieves the required conditions while maximizing energy efficiency.



GMP Labs Attica 2026 This

GMP Καθαροί Χώροι Αττική 2026

BCT has successfully delivered the

Βιομηχανία Τροφίμων Οινόφυτα 2026


BCT successfully delivered a 2-floor

Pharma Industry Avlonas

BCT delivered an ISO 7

Food & Beverage Schimatari

GMP Labs Schimatari 2025 The

Cables Industry United Kingdom (UK) 2025 The project: BCT Group successfully delivered the complete design and construction of five (5) state-of-the-art Drum Degassing Chambers for XLPE cables at the

Cables Industry Korinthos, Greece 2015 BCT Group has undertaken the design and the construction of a cleanroom for ultra-high voltage cable manufacturing, (over 120 kV), at Fulgor SA factory in

Cables Industry Korinthos, Greece 2014 & 2018 Project in submarines hyper high-voltage cables The project: Fulgor SA, a member of Stasinopoulos group of companies, started the manufacturing of submarine high