
FAMAR – Design and build 2 stability rooms
Pharma Industry Avlonas
BCT Group completed the design and construction of ISO 6 and ISO 8 cleanrooms for two new high-voltage cable insulation lines (CCV lines) at the CABLEL factory in Thebes.
The HVAC system comprises three (3) new cleanroom-grade air handling units (AHUs), an air-cooled chiller, piping, and air ducts.
The design achieves the required conditions while maximizing energy efficiency.



Pharma Industry Avlonas

Food & Beverage Schimatari

GMP Labs Schimatari 2025 The
BCT GROUP is a Leading
BCT GROUP is a Leading
BCT GROUP is a Leading
BCT GROUP is a Leading

Cables Industry United Kingdom (UK)


100% Fresh Air Conditioning Unit

Cables Industry United Kingdom (UK) 2025 The project: BCT Group successfully delivered the complete design and construction of five (5) state-of-the-art Drum Degassing Chambers for XLPE cables at the

Cables Industry Korinthos, Greece 2015 BCT Group has undertaken the design and the construction of a cleanroom for ultra-high voltage cable manufacturing, (over 120 kV), at Fulgor SA factory in

Cables Industry Korinthos, Greece 2014 & 2018 Project in submarines hyper high-voltage cables The project: Fulgor SA, a member of Stasinopoulos group of companies, started the manufacturing of submarine high