
Epirus SA – Cleanroom
Project Objective: Upgrading the air conditioning of a cheese factory in Elassona, Thessaly. Dairy Elassona, Greece 2019 Production rooms that upgraded: Pasteurization Engine Room Basque Production Basque Maturation Brining VAT

Project Objective: Upgrading the air conditioning of a cheese factory in Elassona, Thessaly. Dairy Elassona, Greece 2019 Production rooms that upgraded: Pasteurization Engine Room Basque Production Basque Maturation Brining VAT

Beverages – Brewery Patras, Greece 2019 Air conditioning with fresh air – Beer bag packing room Achieving cleanroom conditions with temperature control in the beer bag packing area for the

Life Science Lykovrysi, Greece 2019 Design & Construction of the HVAC system of the new Laboratory spaces and operating rooms of Serum IVF Clinic, in Lykovrysi, Athens. Grade D purity

HVAC and CLEANROOM GRADE D design and construction for the production area of blistering foils of Symetal’s SA factory in Mandra, Attica. The cleanroom formed to produce foils that are

Printing Industry Schimatari, Viotia 2018 HVAC of a 40×23 m printing area at the company’s factory in Schimatari, Viotia. The aim of the project was to achieve the desired temperature

Confectionary & Sweets Tomaszów, Mazowiecki 2018 Project scope was: Design & installation of Ventilation & Air conditioning systems in the new Croissant Production Line Project requirements: Outdoor Design conditions Summer:

Cables Industry Korinthos, Greece 2014 & 2018 Project in submarines hyper high-voltage cables The project: Fulgor SA, a member of Stasinopoulos group of companies, started the manufacturing of submarine high

Soft Drinks Worldwide From 1990 Our Group has a stable and successful collaboration with Coca Cola Hellenic Bolting Company (HBC) from 1990 having executed HVAC projects for Coca Cola in

Assembly Buildings Glyfada, Greece 2017 Our company has provided the central cooling and heating systems for FENIX Hotel, Glyfada Greece. The HVAC systems incorporated a special application which led to

Assembly Buildings Athens, Greece 2017 BCT Group designed & implemented the central cold and hot water system for the cooling and heating needs of the Leroy Merlin building on Vasilissis