BCT successfully delivered a 2-floor AIT facility for ICEYE.
Basement:
- Created two new ISO9 working labs
- Installed the HVAC equipment
- Constructed the electrical facility


Ground Floor:
- Designed & constructed an ISO8 cleanroom with an over-head watchtower and meeting room.
- Reinforcement of flooring with 500kg/m2
- Installed a hygienic-type Air Handling Unit (AHU), for cleanliness control, cooling/heating, and dehumidification.












