Project scope was:
- Design & installation of HVAC systems for the New Production Line of Bake Rolls in Slovakia’s plant.
- Full utilization of the old air conditioning units as well as the old cooler, located in Lamia.
- Installation of a new BMS automation system
![](https://www.bct-group.gr/wp-content/uploads/2022/01/factory_blog.png)
Confectionary & Sweets
![](https://www.bct-group.gr/wp-content/uploads/2022/01/location_blog.png)
Slovakia
![](https://www.bct-group.gr/wp-content/uploads/2022/01/calendar_blog.png)
2020
Our company implemented the following to meet the project objectives:
- Dismantled the old Central Air Conditioning Units from Lamia, Service them, Transfer & Resettlement them in Slovakia
- New networks – infrastructure (pipelines, cables, etc.)
- Airway networks
- Piping networks and cold storage
- Electrical & Automation systems