Rafarm-7223

RAFARM – Design & full renovation of labs and offices

Rafarm-7223

RAFARM – Design & full renovation of labs and offices

Pharma Industry      Paiania          2025

BCT undertook the design and complete renovation – reconstruction of the laboratories and the GMP microbiology laboratory of Rafarm on the 1st and 2nd floors so that the new laboratories would have a larger capacity to accommodate laboratory equipment and to increase the ergonomics of the spaces.
The entire reconstruction was carried out without stopping the laboratories, with the temporary installation of the equipment in microlabs that BCT constructed until the end of the project.
Also, due to the remodeling of the space, a new study of active and passive fire protection was carried out, as well as a study for:

• Electrical requirements
• Data cabling
• Compressed air requirements
• Laboratory air (oxygen, nitrogen, CO2, etc.)
• Cold water
• water
• Sewage

Relevant Projects

Theon

THEON – Cleanroom

Military & Security Applications Koropi 2023 BCT-Group designed and constructed a cleanroom of 180 square meters for THEON INTERNATIONAL, with cleanliness class ISO 8 (during operation), to be used as

Read More »